
Website valcomgroup DND / RCN
This is for a two-year full-time contract, followed by three (3) one-year option periods (for a total of five (5) Year’s employment).
Valcom OPI is David J. Forestell, dforestell@valcom.ca.
Mandatory and Rated Requirements
MT1
The bidder’s resource shall hold a Secret/Level II security clearance.
MT1.2
The proposed resource must have a minimum of eight (8) years, within the past fifteen (15) years, of Life Cycle Management working experience in support of a Weapon System* or a Defence Support System**.
* Weapon System: A combination of one or more weapons with all related equipment, materials, services, personnel and means of delivery and deployment (if applicable) required for self-sufficiency, for example but not limited to: Surface combatant ships, submarines, fighter aircraft, patrol aircraft, armoured vehicles.
** Defence Support System: A system, not classified as an instrument of combat, used in a defensive or support role, for example but not limited to: logistics vehicles, transportable rigid wall shelters, shelters, air delivery aircraft, auxiliary vessels, radar systems, sonar systems, ground support equipment, equipment diagnostics data processing systems.
RT1.1
The proposed resource must have over eight (8) years, within the past fifteen (15) years, of LCMS working experience in support of a Weapon System or Defence Support System.
RT1.2
The proposed resource must have experience in conducting studies and analysis to provide technical solutions to stated technical/logistic or operational requirements/problems including reviews and preparation of Engineering Changes (ECs).
RT1.3
The proposed resource must have completed DND DRMIS courses for LCMM, or is certified in Plant Maintenance in SAP®:
RT1.4
The proposed resource must have experience in utilising DRMIS or SAP Plant Maintenance Module.
RT1.5
The proposed resource must have experience in preparing and reviewing parts lists and provisioning documents.
RT1.6
The proposed resource must have experience in preparing and reviewing operating and maintenance manuals.
RT1.7
The proposed resource must have experience in preparing and reviewing material management policy documents.
RT1.8
The proposed resource must have experience in preparing and reviewing disposal documentation.
RT1.9
The proposed resource must have experience in investigating Non-Conformance Reports, Unsatisfactory Condition Reports (UCRs) or Technical Failure Reports (TFRs) and making appropriate recommendations.
RT2.1
The proposed resource must have over eight (8) years, within the past fifteen (15) years, of LCMS working experience in support of a Weapon System or Defence Support System.
RT2.2
The proposed resource must have experience in conducting studies and analysis to provide technical solutions to stated technical/logistic or operational requirements/problems including reviews and preparation of Engineering Changes (ECs).
RT2.3
The proposed resource must have completed DND DRMIS courses for LCMM, or is certified in Plant Maintenance in SAP®.
RT2.4
The proposed resource must have experience in utilising DRMIS or SAP Plant Maintenance Module.
RT2.5
The proposed resource must have experience in preparing and reviewing parts list and provisioning documents.
RT2.6
The proposed resource must have experience in preparing and reviewing operating and maintenance manuals.
RT2.7
The proposed resource must have experience in preparing and reviewing material management policy documents.
RT2.8
The proposed resource must have experience in preparing and reviewing disposal documentation.
RT2.9
The proposed resource must have experience in investigating Non-Conformance Reports, Unsatisfactory Condition Reports (UCRs) or Technical Failure Reports (TFRs) and making appropriate recommendations.